April 20
Surprise how little traffic was in both the collectors and express lanes going west at Mavis that it was a quick trip to get over the Credit River and wide open there after. Eastbound was moving very slow from the Credit River to the 407.
Forming in place for the beam support for the express bridge over the Credit River and saw no supports for the Orangeville line as well CN Halton Sub. Deck pour for Sixteen Mile Creek bridge with some forming for the barrier walls.
Light Mast going up between Sixth and Frith Line.
Grading taking place going west of the 407.
April 21
First time in a long time I had to use the full eastbound section and surprise there are 3 lanes of traffic now that was only doing at best at time 45 km from west of the 407 to the Mississauga Rd northbound on ramp where it went to full speed limit.
The various piles of dirt and concrete being crush into gravel that was being stock pile and moved to various locations. Lots of storm water trunk line being install
Credit River
Orangeville Line
Sixteen Mile
Looks like crews working to remove the old 24 overpass in Cambridge. Still a lot of centre barrier to be pour for the extension.
Grand River Bridge
Looks like the deck is pour with some barrier wall being form. The lanes from the bridge going west ready for base gravel and paving.
Most of the new lanes on the east side almost finish being pave. Should be using the new bridge by the summer to allow the shifting of traffic.