Nope. No widening, no concrete median.
Seems like a waste - may as well use the rebuild as an opportunity to upgrade the thing.
Website:
http://hwy401reconstruction.ca/
Thanks
I was going by what the locals told me since they are piss off that they are spending an extra 10-30 minutes in travel time each way, depending on the day and time. I guess they are hoping that there will be 6 lanes and a concrete median after 6 years and fully agree.
Having median Wire is not going to do much in the long run.
They are tic off having the road close when someone ends up in the median and kill. One took place a week ago.
I always found it strange that there is 6 lanes east of the 401/402 and west of Tilbury, yet not between them, considering the amount of traffic (trucks) on it.
It was nice to see the asphalt replace with concrete west of Tilbury since you would have ruts within months of the repaving or a year, especially the right lane from trucks. Then adding the 3rd to the 403 cut off, but time for a 4th.
Heading home today, only 2 lanes east of London going eastbound, with work getting ready to make the westbound 3 lanes to 2.
The new bridge for Woodstock is wide enough for 4/5 lanes in each direction, as well having a higher clearance that is long over due. I expect this will happen to all bridges and long over due.
Stop off in Hamilton and the signs said the QEW to Fort Erie was block in both directions at X with the traffic going south at a stand still at Brant St. When I got on the westbound QEW again a couple hours later, still a stand still and coming to a stop around Kerr St in Oakville. Very few options getting around this mess.