Report is coming to Scarborough Community Council's next meeting on May 2, 2018.
Background Report Linked here: https://www.toronto.ca/legdocs/mmis/2018/sc/bgrd/backgroundfile-114116.pdf
Key Highlights:
Make McCowan/Progress intersection at-grade again, removing the current overpass arrangement and on/off ramp infrastructure.
Reduce lane capacity on Borough Drive from 4 lanes to 2 lanes, adding bike lanes and sidewalks as applicable.
(longer term) Extend Bellamy Road north under/over the 401 to Milner.
Extend Bushby eastward to Bellamy.
Additional fine-grained streets.
Accommodate future BRT to Durham Region
Masterplan for STC Mall lands is separate, but in progress.
***
So far, so good. If delivered it would be a material improvement.
But the mall lands will prove to be key.
I would really like to see the property severed into approximately 9 pieces.
Moving the alignment of Progress south so that it doesn't go so far out of its way around the current mall.
Repurpose the existing Progress as a new E-W street from Brimley to McCowan.
Get at least 3 new N-S roads through the mall lands breaking them into manageable blocks.
More would be fine.
Replace the mall across at least 2 of those blocks, with a 'path' connection, new density over the top, and the mall foot print spread over 3 general floors, with department stores being 4, to allow for a more space-efficient layout.
But one thing at at time.
Report is coming to Scarborough Community Council's next meeting on May 2, 2018.
Background Report Linked here: https://www.toronto.ca/legdocs/mmis/2018/sc/bgrd/backgroundfile-114116.pdf
Key Highlights:
Make McCowan/Progress intersection at-grade again, removing the current overpass arrangement and on/off ramp infrastructure.
Reduce lane capacity on Borough Drive from 4 lanes to 2 lanes, adding bike lanes and sidewalks as applicable.
(longer term) Extend Bellamy Road north under/over the 401 to Milner.
Extend Bushby eastward to Bellamy.
Additional fine-grained streets.
Accommodate future BRT to Durham Region
Masterplan for STC Mall lands is separate, but in progress.
***
So far, so good. If delivered it would be a material improvement.
But the mall lands will prove to be key.
I would really like to see the property severed into approximately 9 pieces.
Moving the alignment of Progress south so that it doesn't go so far out of its way around the current mall.
Repurpose the existing Progress as a new E-W street from Brimley to McCowan.
Get at least 3 new N-S roads through the mall lands breaking them into manageable blocks.
More would be fine.
Replace the mall across at least 2 of those blocks, with a 'path' connection, new density over the top, and the mall foot print spread over 3 general floors, with department stores being 4, to allow for a more space-efficient layout.