lead82
Senior Member
How do you figure a bridge would be less expensive? A tunnel machine can just bore down without disturbing the environment above. It can be launched near Downsview and tunnel all the way east until it meets up with the tail tracks by Senlac. The only cut & cover I see would be for the station at Bathurst.
I'm not sure if this bridge can be retrofitted a la Bloor Viaduct to have the subway go underneath the roadbed. If it can, then it may be cheaper, if not, a new bridge would be expensive and disruptive to the environment, since the valley would need to be further destroyed to create this new structure. Also it would be traffic chaos if the existing bridge needs to be closed as it was after the 2005 rain storm.
Tunnelling is cheaper if you consider all the costs, and not just the cost to tunnel.
I'm not sure if this bridge can be retrofitted a la Bloor Viaduct to have the subway go underneath the roadbed. If it can, then it may be cheaper, if not, a new bridge would be expensive and disruptive to the environment, since the valley would need to be further destroyed to create this new structure. Also it would be traffic chaos if the existing bridge needs to be closed as it was after the 2005 rain storm.
Tunnelling is cheaper if you consider all the costs, and not just the cost to tunnel.