I haven't been following this too closely. Am I correct in assuming, as I look at that map and the link that you provided, that:
- the Confederation Line from Lebreton to Blair is under construction?
- Lebreton to Bayshore/Baseline and Blair to Place d'Orleans are Phase 2, along with an extention of the Riverside line to Riverside South?
What is the target date for opening of Phase 1? Are they really on track to commence construction of Phase 2 in 2018? What's the status of the airport extension? What's the status/timing of Phase 3 (extension out to Kanata)?