Strata last week:

4419002252_630bc44d33.jpg

4418229245_9cec69f816.jpg

4418226535_bd8047c56a.jpg


Progress on the Performing Arts Centre:

4432632818_7cf2679221_o.jpg

4418242497_0779dd3d84.jpg
 
I was surprised at wht I saw on Thursday considering where they were in Aug. I was expecting to see the first floor now.

Click for the full size
 
May 05
Now they are on the main tower section, they should be doing a floor a week. I like the stone work that has been installed since my April visited and can't wait until my next visit in June. Standard glass framing design that can be found on all types of condos in Toronto.
5692605292_75a687a985_b.jpg

5692606262_45582f7e35_b.jpg

5692608156_50c7d6572c_b.jpg

5692613028_6fe7513182_b.jpg

5692053105_3269ae1a0c_b.jpg


More Photos
[video=youtube;lHJ0bEjXRBc]http://www.youtube.com/watch?v=lHJ0bEjXRBc[/video]
 
Thanks for the update, Drum. Great progress on this one and I appreciate how it will greet the street - something that is uncommon for this part of Burlington. Should be an above average development once it is complete. The Molinaro Group has really taken off in downtown Burlington with 5 or so tall apartment buildings in the last 10 years.
 
June 22
The base is turning out nicely with brick going up on the podium section. The tower should be top off when I am out there in July at the current rate of climb.

Too bad the base is set to far back from the street edge.
5865700470_e89a25301b_b.jpg


5865698184_368de7e340_b.jpg


5865143379_edd8a22408_b.jpg


5865141089_aed0235f2a_b.jpg


5865691658_1e64efd696_b.jpg


5865688904_d957e47c8c_b.jpg


5865138247_e3acbf501b_b.jpg
 
On the contrary.

Separate podium from tower and continue brick to ground. Remove stone base and discard in safe manner. String one (1) small glass canopy over of three (3) glass-mullioned, at-grade retail units and circle structure with funky paving pattern.

In just a few easy steps, you've got a recipe for a cheap, easily-repeatable mid-rise which could fill many wanting sites in the downtowns of cities and towns all over Southern Ontario. Experiment with different heights and materials for exciting results! Call now!
 
Aug 18
They should have the yellow bricks up on the south end and the rest of the red brick on my Sept visit. The crane should be down at the end of Sept or early Oct.

It will be interesting to see what type of retail will go in here since there very little there now.
6057358473_90653174ca_b.jpg


6057357051_42d33af415_b.jpg


6057903904_12210a7dd2_b.jpg


6057907366_3475962cba_b.jpg


6057910248_893a60d981_b.jpg


6057911924_a7299359eb_b.jpg
 
Nov 10
Surprised to see the tower crane was still there today as they very little left to be done in Oct visit. Should be gone by December.

The building will be 100% enclose come December.

Handrail framing is being install without the glass at this time.

Still wish they went with the yellow brick in various places as it would enhance the building more.

Need to build a few of these in Toronto that are taller than this one.
6333953914_0c8d22d532_b.jpg


6333200173_c112dbd4e5_b.jpg


6333954216_ab2be1807b_b.jpg


6333955878_3a9756df1b_b.jpg


6333204153_f2d61ac371_b.jpg


6333957638_1a7fcdaab0_b.jpg
 
Dec 08
They are finally taking the tower crane down. They started to removed the counter weight and had place a few on the ground when the winds pickup to the point the lift was cancel for the day.

Only a small amount of brick work to be done, otherwise the building will be enclose for the winter to do the final interior work.

Glass is still missing for the baloney railing and don't expect to see that now until spring.

More shots up on the site
6480486775_4d3bd7b498_b.jpg

6480481383_a831a7c1eb_b.jpg

6480479893_ab0fd7e7b8_b.jpg

6480479319_a477bbcb9c_b.jpg

6480478363_a2a84c9e73_b.jpg


6480475627_b5a749cb53_b.jpg

6480472511_9e78091592_b.jpg

6480470531_164b1a9fb7_b.jpg
 