2024-06-18 13:07 Richmond & York St
|
|
|
I think Richmond is still closed. This from City, extended 24 hoursDon't be surprise that once Queen is back in service that the southbound track and 2 way traffic will disappear like it did in 2013.
I agree with those switches and taking the southbound tracks to King would improve TTC ability to to short turn or reroute due to an issue between York and Church on King St.
Will TTC have this detour route open by the time when King is Close at Spadina for the TIFF? It will take the pressure off Queen to have the 504 use Adelaide St for eastbound and could use Wellington to York to reduce some pressure on Richmond, but will still have it on Queen from York to Spadina though.
Now, did the the Richmond intersection open at 6am as plan?
looking at the photos last night that were said paving will be taking place today for the intersection and will not open as plan. Wouldn't be surprise if concrete was being pour for the section north of Richmond along with any other work not seen in the photos.
It's open .. the proof is in the tarmac, pudding i mean .. the pics above
Yes, I just walked by and, through the sweat, saw it open.It's open .. the proof is in the tarmac, pudding i mean .. the pics above
Yes, I just walked by and, through the sweat, saw it open.
I'll start by saying I agree with the general principal that the TTC should be adding curves when opportunities arise, more curves generally provide more options, especially in an unforeseen detour. However, after looking into the trackage in this area I'm not surprised this particular curve didn't get built for the following reasons:It seems unfortunate that the TTC did not install a west to south curve from Richmond to York during this work - for diversions or short turns. The addition of southbound track on the short block of York from Adelaide to King would also give flexibility and I suppose this MIGHT be added when the track on King is rebuilt in 2026(?)
I'll start by saying I agree with the general principal that the TTC should be adding curves when opportunities arise, more curves generally provide more options, especially in an unforeseen detour. However, after looking into the trackage in this area I'm not surprised this particular curve didn't get built for the following reasons:
- The westbound diversion of the 504 between Church and King is already possible, and I'd argue, better along Wellington than Richmond as it's closer to the route on King. There is a west to north curve from King to York now. Ideally there would be east to north too and (in an ideal world) south to west.
- I don't believe there's been a commitment to actually add in those tracks south from Adelaide. Without them the curve doesn't add anything aside from providing an alternative route for the on-street loop in the event of a blockage on Victoria. Yes, of course, if there is no southbound track on York from Adelaide to King then there is no need for (or possibility of) curves. The TTC say they 'may' build it when King is redone in 2026(?)
- The curve does open up a 501 diversion from the East if York isn't available to turn back, provided the tracks to King are built with the added curve. However, a better curve to build to enable this is a South to West curve at Church & King since that would mean fewer turns. There is one now.
- The fact is, curves are expensive and Metrolinx is only paying to add what they need to operate the diversion. Additional special work at Adelaide and York probably wasn't that costly, but given this intersection only needed tangent rail, a special work addition was likely a larger increase for the TTC to swallow. Of course cost is a factor but the TTC NEVER thinks ahead or, if they do, forgeta bout it. A few years ago they looked at several new curves and selected 3 or 4 as desirable when next doing those intersectioins. They 'forgot' about both - Church/Carleton and Broadview/Dundas when they had the chance.
Not sure what you're trying to say here. The N-W curve is present and can be used to execute the same diversion as W-S at Richmond and S-W at King. I'll grant you that the E-N curve may also be useful and should already exist.1. There is a west to north curve from King to York now. Ideally there would be east to north too and (in an ideal world) south to west.
You're correct, I was going by a TTC overhead map I had open that doesn't show this curve.3. There is one now.
Whether they arrived at the decision to only install tangent southbound at Richmond due to their neglect to think ahead, forgetfulness, or through careful consideration of the utility isn't something that I think either of us can say for certain. You will get no argument from me that the TTC has frequently dropped the ball on adding useful curves to the streetcar network. However, the main point of my original response is that this particular curve isn't that useful.4. Of course cost is a factor but the TTC NEVER thinks ahead or, if they do, forgeta bout it. A few years ago they looked at several new curves and selected 3 or 4 as desirable when next doing those intersectioins. They 'forgot' about both - Church/Carleton and Broadview/Dundas when they had the chance.
I paid some extra attention today while walking through here and I noticed there appear to be lot of utility access points down that stretch of York, one even right where the south-west curve would be at King. I wonder if it would require a major relocation project to accommodate this.It seems unfortunate that the TTC did not install a west to south curve from Richmond to York during this work - for diversions or short turns. The addition of southbound track on the short block of York from Adelaide to King would also give flexibility and I suppose this MIGHT be added when the track on King is rebuilt in 2026(?)
Yes, very good points, utility conflicts do conflict!I paid some extra attention today while walking through here and I noticed there appear to be lot of utility access points down that stretch of York, one even right where the south-west curve would be at King. I wonder if it would require a major relocation project to accommodate this.
There might even be a Toronto hydro vault in the way at King and Pearl as I see they have two manholes in the middle west side of the road at that intersection.