I'm not sure what's going on here, they're adding a 2nd lane to the existing streetcar track for the detour is the existing track all being replaced, and they're tearing out the old one where the twinning is extended?

Took me a while I found the final layout but I'm still wondering are they keeping the existing track and adding or ripping it all out

1713549489013.png
 
Last edited:
View attachment 557724

I'm not sure what's going on here, they're adding a 2nd lane to the existing streetcar track for the detour is the existing track all being replaced, and they're tearing out the old one where the twinning is extended?

Took me a while I found the final layout but I'm still wondering are they keeping the existing track and adding or ripping it all out

View attachment 557739
The existing northbound track from King to Queen remains, they are installing new southbound track from Queen to Adelaide. It's not rocket science.

Here is the future 501 route map. The existing track from Front north to Wellington/King to Adelaide will be available for detours (and the Wellington/King section for the 503 on assumption it returns to its old route on Wellington once the 501 moves.)

1713551762595.png
 
Last edited:
I'm not sure what's going on here, they're adding a 2nd lane to the existing streetcar track for the detour is the existing track all being replaced, and they're tearing out the old one where the twinning is extended?
Correct, they are adding another lane of streetcar track here. However, the old track isn't being torn out, the existing northbound track pictured is all staying.

On York specifically, they are only adding a new southbound track from Queen to Adelaide. As well, there is one remaining curve to be added from eastbound Queen to southbound York. No curves that cross the northbound track are being added and that track is probably only 10 years old with light wear considering since its installation it hasn't been part of a revenue route, so no reason to believe it can't serve the 501 diversion for the duration of OL work.
 
Correct, they are adding another lane of streetcar track here. However, the old track isn't being torn out, the existing northbound track pictured is all staying.

On York specifically, they are only adding a new southbound track from Queen to Adelaide. As well, there is one remaining curve to be added from eastbound Queen to southbound York. No curves that cross the northbound track are being added and that track is probably only 10 years old with light wear considering since its installation it hasn't been part of a revenue route, so no reason to believe it can't serve the 501 diversion for the duration of OL work.
When I saw the photo I was thinking it must be a new challenge to add tracks next to an existing one, hope I can check it out and add some close up shots
 
Originally, Adelaide was a two way street, so I assume one set of tracks will be removed.
My apologies, I believe I may have created some confusion here. The one photo showing two sets of tracks was of the section of York Street where the new southbound tracks, still incomplete, are being added. Adelaide has only one set, eastbound, of tracks, now continuous (except for the overheads), from Spadina to Church streets. The photo of the York Street section should have been identified as such.

As a project, both the York and Adelaide streetcar track additions are grouped under this 'Street Car Tracks on Adelaide' thread.
 
Originally, Adelaide was a two way street, so I assume one set of tracks will be removed.
They have been since last year. Only the section west of Victoria is been rebuilt for eastbound as the east section was done years ago.
 
April 25
People will be happy to hear the northbound track as well the road where the southbound track is to place has been excavated up to Richmond. This includes the northbound track north of the new section built last year. Don't expect any track base to be pour this week

More to follow when I have time
133A0934.JPG
 
April 25
Finally got to these shots with more up on my site
53690809420_f08a7ddfc7_b.jpg

53690721959_d2bcea5ff1_b.jpg

53690809290_bac46bdf4a_b.jpg


No access to the parking garage
53690809180_de08590890_b.jpg


Not sure if the rail is for Queen work or not
53690809185_0911a8bf1f_b.jpg
 
May 2 - Lots of work going on Adelaide Street, as well as the Richmond to Adelaide Streets section of York Street. The entire project seems to be very active, with one small, but crucial exception. No work yet on the York Street section between Richmond and Queen Streets - as shown in the first photo below.

1000004431.jpg


York Street Photos:


1000004430.jpg


1000004428.jpg


1000004429.jpg


Adelaide Street Photos - Lots of curb lane remediation activity in different areas between First Canadian Place and Yonge Street.
1000004432.jpg


1000004433.jpg



1000004437.jpg


1000004434.jpg


1000004435.jpg


20240502_141100.jpg


1000004440.jpg
1000004438.jpg
 

Attachments

  • 1000004436.jpg
    1000004436.jpg
    318.2 KB · Views: 38
  • 1000004464.jpg
    1000004464.jpg
    456.4 KB · Views: 43
  • 1000004439.jpg
    1000004439.jpg
    494 KB · Views: 35

Back
Top