Yes and no. The order is still for 70 sets, but plans for a further 10 sets were cancelled for cost reductions in the budget.
The first order (in December 2006) was for 39 train sets (to replace the 30 train sets of H4 and H5 equipment, and provide for some growth. This included an option for a further 21 equipment sets (bringing the total to 60 sets) to replace the 21 train sets of existing H6 equipment and to add 8 train sets for the Spadina extension (coming out of that budget) - for a total of 68 train sets. In May 2010 TTC exercised this option, and also added a further 2 train sets for the Spadina extension, to bring the total of new train sets to 70.
There was in the 2011 capital budget an item to purchase a further 10 train sets (bringing the total to 80), to allow for increased service and growth, however this would also require additional storage space (which was also planned by prebuilding the Yonge extension subway tunnel north to Cummer to store 10 trains). It was the proposal for these further 10 train sets, which had never been ordered, which was cancelled (or at least postponed out of the 10-year budget timeframe) in the 2012 budget.
Many thanks for the details, the clarification is appreciated.