Likely the same as others, just had my occupancy pushed back again to October 4th. Hopefully this is the last time...
 
Might be a good thing. I'm hearing occupancy fees (other projects) are much higher than usual with the high interest rates.
 
Saw my unit as well as several other units en route to 4th floor. October seems...feasible...but quite a few units still down to the studs. Honestly am very happy with how it's turning out just very slow
 
The latest iteration of the project timeline indicates that work on the park here is expected to start in April and end in June 2026



Project Timeline

  • November 2024: Hire a design team
  • April 2025: Community Engagement Phase 1
  • May to July 2025: Community Engagement Phase 2 and detailed design
  • August to November 2025: Hire a construction team
  • April 2026: Construction starts
  • June 2026: Construction complete
The timeline is subject to change.


55bro.JPG


The final park design and layout were determined using feedback from the community. The new park will comply with the Accessibility for Ontarians with Disabilities Act (AODA) and will include:

  1. Existing sidewalk
  2. Armour stone on limestone screening
  3. Double P-gates
  4. Park sign
  5. Traditional light pole
  6. Concrete pathway
  7. Waste and recycling bins on concrete pad
  8. Lawn area
  9. Brown permeable pavers
  10. Drinking fountain and bottle filler with pet fountain
  11. Games table (for chess, checkers, etc.)
  12. Planting bed with pollinator plants, ornamental grasses and shrubs
  13. Park bench
  14. Shade tree
  15. Existing trees on adjacent properties
  16. Open lawn area
  17. Single P-gate
  18. Existing laneway
  19. Existing residential building
  20. Existing fence
  21. Catch basin
 

Back
Top