The Fifth floor is now fully formed and being poured. The four foot thick transfer slab for the Fourth Floor can be seen clearly. While 64-68 Bathurst does not have much podium the small setback between the Third and Fourth floors at the north end of the building can now be seen. The Ground, Second and Third are non-typical, with retail, office, and amenity areas, with the transfer slab setting the foundation for the residential area typical floors, Fourth and above. The building should progress much more quickly having reached the typical floor stage.
South, North and Top views. Formwork for the Sixth floor being set up at the north end of the building, while rebar is being installed in preparation for pouring the Fifth Floor concrete slab at the south end.
Pouring the south end of the Fifth Floor floor slab. Lots of concrete trucks in the community this morning, as Portland Commons is busy pouring concrete as well.