Today.
2E4FBE64-6A69-424C-A5EC-9DE5EC64AC1C.jpeg
 

Attachments

  • 2E4FBE64-6A69-424C-A5EC-9DE5EC64AC1C.jpeg
    2E4FBE64-6A69-424C-A5EC-9DE5EC64AC1C.jpeg
    245.3 KB · Views: 731
This shot of @skycandy's in the River City 3 thread shows exactly the kind of panels which should be used on the side walls at Alter.

rc3-6-jpg.129610


Would that be so difficult Tridel/aA?

42
 
https://www.tridel.com/blog/kitchens-installed-17th-floor-alter/
January 2018 Construction Update

Since our last update, the concrete pour for the Alter community has been completed. Window installations are taking place on the 30th floor along with rough-in plumbing and electrical work. Interior finishes such as drywall is being installed on the 25th floor, paint is on the 21st floor, tile installations on the 18th, kitchens on the 17th, and flooring is now on the 12th floor. The mechanical penthouse walls are almost complete. Once done, this allows the site to begin working on the mechanical systems for the community, moving ever closer to the start of occupancies.
 
I see someone decided to bring out their first semester architecture drawings and have another look.
 
Despite the poor reaction this one is getting among some forumers, I think as more of the white balcony guards go up and create the zig-zag effect, the elevations are having a pretty successful effect. Taken into account that this is Tridel, I think great work has been done here. It's also great to see the office component coming to life - a truly mixed use project.

Snapped some pics; excited to see what cafe goes into the unit with the overhead roll-up door.

7YDDF2o.jpg


5s2kdxP.jpg
 

Back
Top