Part of the community consultation process resulted in various set-backs. The developer shifted the location of the tower due to a variety of concerns through a consultation process that lasted close to a year-in-length. Virtually all aspects to the design have gone through numerous changes beyond what the general public has seen in various renderings and drawings posted on urban toronto - changes that a major such as the shape and orientation of the tower, to a multitude of minor shifting of elements such as moving the podium back two feet here and then a foot there... or shifting exterior lighting for safety to view protection screens, to material/colour palates and the list goes on and on. This thing has been designed to death as every stakeholder wants thier various issues resolved. Love it or hate it, almost everything you see in the design/rendering was an outcome of either the public/stakeholder consultation process with the city/planning department or the design review process.