Looks more like they are just installing the base frame, with concrete then to be poured around it. If so, crane day should be later this week, or on the weekend....
9:45… I can't stop looking.
Final report from the June TEYCC:
http://www.toronto.ca/legdocs/mmis/2015/te/bgrd/backgroundfile-81024.pdf
Yuck.
AoD
Final report from the June TEYCC:
http://www.toronto.ca/legdocs/mmis/2015/te/bgrd/backgroundfile-81024.pdf
Yuck.
AoD
enlighten us... whats the 'yuck' in reference to?