From the Agenda of the Sept 24 WT Investment & Real Estate Committee Meeting:


1600508365842.png


1600509663942.png


1600508470189.png


1600508535931.png
 
Last edited:
Rekai made a presentation to the West Don Lands committee (which is a coalition of several neighbourhood groups in the east downtown) and got a very positive reception. The WDLC wrote to the Minister of Long Term Care and strongly supported this proposal.

"On August 24th, the Rekai Centres made a full presentation to a WDLC meeting. The presentation was received with enthusiastic support by committee members and members of the public present at this virtual meeting. Participants were supportive of both the well-designed architectural plans and the overall program in which Rekai intends to include four innovative components to the LTC facility: Dementia and Alzheimer focused space; the Seniors Assessment Centre; a Dialysis Centre; and the College for PSWs. The total program will be an outstanding addition with significant benefits for the broader community."
 
Excellent piece in NRU today (which cannot be linked) about how Rekai Centres are adapting site programming and learning from the COVID-19 experience to deliver a better building and operations at Cherry Place.

But the main take-away is that they anticipate construction to begin in Q2 2021.

BTW the thread title here still mentions Options for Homes (and not Rekai Centres, not great for google search!)
 
BTW the thread title here still mentions Options for Homes (and not Rekai Centres, not great for google search!)
The database entry has been updated now, therefore the thread title has been automatically updated. We also have a front page story on this up now!

42
 
  • Like
Reactions: DSC


The Rekai Centre Cherry Place

Overview

The Rekai Centres is a not-for-profit agency currently providing Long Term Care services from 2 Homes in downtown Toronto. This new building, Rekai Cherry Place, will replace one of the existing Homes and will consist of 348 Long Term Care Residents as well as a Dialysis Clinic and a 50 student Co-op school program for Personal Support Workers (PSW) in partnership with Humber College.

Situated in downtown Toronto near the mouth of the Don River and adjacent to the newly created community of Corktown, the Distillery District and St. Lawrence neighbourhoods, the location is a remarkably vibrant setting for a Long Term Care Home. It positions our most vulnerable seniors in the heart of a vital and emerging area of the city. Rekai Cherry Place occupies a long narrow lot, fronted on the west side of Cherry Street and bounded by Front Street to the south, Eastern Avenue to the north. The available footprint for building is approximately 24 metres by 100 metres.

Residents and the required support and amenity spaces are accommodated over 12 floors in order to manage the very small site. Important outdoor open spaces are provided through series of terraces and roof gardens, all with views into the downtown core and Lake Ontario providing residents with an important view out to the world.

The design takes important proactive infection control measures such as accommodating 4 rooms equipped with negative pressure to be used to isolate those infected and equipping a few rooms with oxygen supply. These measures will limit trips to the hospital and help the overall health system.
 
Site Plan Approval application submitted:

Development Applications

Project description:
Site Plan Approval for a 13-storey non-profit long-term care facility, comprised of 348 long-term care beds in combination with a Seniors Assessment Centre, a Dialysis Clinic, a Personal Support Worker College program and a café/bistro at Cherry and Front Streets. A total gross floor area of 23,773 square metres is proposed, along with 5 vehicle parking spaces, 52 bicycle parking spaces and one Type G loading space.
 

Back
Top