• Thread starter Suicidal Gingerbread Man
  • Start date
Not sure if these have been posted here yet. The CIBC square website features marketing material and renderings of 141 Bay now (phase 2), leading up to its construction.

Source: http://www.cibcsquare.com

new_image_3_v2.jpg


full_size_zoom3.jpg


new_image_4.jpg


new_image_5.jpg


new_image_6_v2.jpg
 
Height for this thread is already the Phase 2 height so I would assume not (though may be easier if they were separate).
 
I'm not sure how a second thread would have more pros than cons.

42
 
I noticed the two different versions as well in those photos. Had me wondering which we'll see in the finished product.
 

We really missed an opportunity to mandate that any new building along the rail corridor deck over it with a park and in exchange be allowed air rights over the corridor like CIBC tower 2 is getting. Right now, Telus, PWC, Delta Hotel and The Well and much of City Place would've decked over most of the downtown portion of the rail corridor by now. The city would fill in the gaps.

There's still an opportunity for the Metro Convention Centre redevelopment and Union Centre.
 

Back
Top