Part 1 (15 attachment limit!!! This is going to be a lot.)
Steel is going up for the podium that will sit on top of the tracks.
The tower & podium.
Glass is proceeding well.
The lobby.
They’ve already put some glass for the walls in the lobby.
The glass is pretty high up now.
The windows for the bridge are almost done, just one more on the left.
The small window on the right is installed.
BONUS: 25 The Esplanade.
It’s getting pretty dense.