"Alan Vihant of Concord Adex, at the future intersection of Dan Leckie Way and Fort York Blvd., says he’s not sold on the worth of a bridge over the railway tracks to Portland St."
Perhaps they think someone is going to walk away with their $8 million bridge. I noticed that there were security guards posted at each end when it was open today as well.
The bridge is close until 2013 or until agreement is in place to keep part of the bridge open while about 6,000 clamps holding that garbage mesh are replace. The clamps have very rough edges and can be move around.
I was one of the few first visitors to shot the bridge before the ribbon cutting. Should had shot a video.
The mesh is not great for getting any rail fan shots from the bridge.
Seriously, what the f*ck. Unless the structure is crumbling there is no reason whatsoever not to keep the bridge open while they do whatever needed repairs. I understand the change is not structural and it's mostly to do with the mesh... That's an excuse to keep it closed for one more week at most.
The bridge itself is a delight. Used it several times today and would have made my commute much more convenient. The ineptitude of those responsible for the latest drawback disturbs me. The structure has been there for ages... they've had more than enough time to make everything perfect.
They'll probably just cover the bridge in black mesh like what's on the balconies of 15 Iceboat Terrace and 10 Capreol Crt and leave it there until it starts falling off...