Coincidentally, I have couple pics from today. More working is being done on sidewalks:

20171120_162436.jpg
20171120_162513.jpg
 

Attachments

  • 20171120_162436.jpg
    20171120_162436.jpg
    226.6 KB · Views: 656
  • 20171120_162513.jpg
    20171120_162513.jpg
    243.1 KB · Views: 645
Some of the weathered steel was installed when I passed by tonight (wasn't able to take a pic unfortunately). Looks pretty great!
 
Some of the weathered steel was installed when I passed by tonight (wasn't able to take a pic unfortunately). Looks pretty great!
Yes, they were installing corten steel on the wall above Lake Shore yesterday afternoon and had the supports up for the panels on the wall above Rees. Looked very good.
 
I hope it gets lit up, it looks like a grill so I suspect there will be a back light.
 
I hope it gets lit up, it looks like a grill so I suspect there will be a back light.

Unfortunately no. You can see in the pictures of the installation that no lighting was in place. That’s something that would have been done before.
 
Work on the sidewalks and edge of the road going on up by Bremner:

DSC05991.jpg

DSC05992.jpg


I was surprised to see just how see-through the Corten screens are.

DSC05993.jpg

DSC05995.jpg

DSC05994.jpg

DSC05994 - Version 2.jpg


…but, yup, I think it's all going to be quite striking when done!

42
 

Attachments

  • DSC05991.jpg
    DSC05991.jpg
    362.4 KB · Views: 902
  • DSC05992.jpg
    DSC05992.jpg
    296 KB · Views: 499
  • DSC05993.jpg
    DSC05993.jpg
    271.6 KB · Views: 549
  • DSC05994 - Version 2.jpg
    DSC05994 - Version 2.jpg
    391.6 KB · Views: 515
  • DSC05994.jpg
    DSC05994.jpg
    308.2 KB · Views: 586
  • DSC05995.jpg
    DSC05995.jpg
    322.8 KB · Views: 573

Back
Top