November 24 - and at least one more floor to go for Concord Canada House - another round of vertical column rebar is now being installed.

1000002569.jpg


20231124_163447.jpg
 

Attachments

  • 1000002568.jpg
    1000002568.jpg
    225.2 KB · Views: 64
First time I've actually been able to make out the Maple Leafe on this project in this video via Johnny Strides. (at the 16:37 mark) I actually think this project looks okay on the south side, it's the north side that reminds me of typical Concord Adex crap.

 
I don't mind it, but that's only because the materiality is very slightly better than other phases of Concrd CityPlace, and the design is okay. Not amazing, just uninteresting. It's problematic because for such a massive building complex, it reads as filler, like a background set for a video game or movie, despite being some of the tallest towers in the city, and the "landmark" of the neighbourhood.
 

Back
Top