Ive noticed that the pole lamps in the eastern portal of the Science Center station has been on 24/7 since they were installed at the beginning of the year. Did they forget to program it to turn off during the day? Wired it to the wrong circuit?
 
Eglinton Ave between Weston Rd and Black Creek Dr in the process of being rebuilt with the north side bring done first. Most of the sidewalk and curb is in place with a large barrier wall in front of the Weston main entrance.

Sidewalk on the south side being rebuilt from the NO Frill driveway to Black Creek as well part of the driveway. By the look, there will be traffic lights install at the NO Frill driveway as you can see cable locations in the current medium.

Curb pour for right hand turning at Weston Rd.

Looks like Eglinton will be reduce as the curb on the north side are a fair distance from the sidewalk.

Work in process for the plaza at the main Weston Rd entrance to Weston Rd.

Eglinton Crosstown LRT​

Construction Notice
5692fa05-39ce-4499-beba-e6034a51172c.png

Nightly Westbound Lane Closures on Eglinton Ave W - Weston Road & Black Creek Drive

Monday, July 26, - Friday August 13, 2021​

56783818-c753-18af-4ea4-3a365a18fd9e.jpg
f06a3bb0-dd2e-2c3e-470e-d60777a10ed7.jpg
As early as July 26, the westbound lane of Eglinton Avenue W between Black Creek Dr and Weston Rd will be closed on weekday evenings to install the fire hydrants and facilitate wet utility connections work. Closures will be in place between 8:00 pm and 6:00 am, for approximately three (3) weeks. Westbound vehicles will be detoured south on Black Creek Dr.

What to Expect​

Crews will be performing wet utility connections work on Eglinton Ave W., from July 26 - August 13, 2021.
The westbound lane of Eglinton Avenue W between Black Creek Dr and Weston Rd will be closed between8:00 pm and 6:00 am, Monday – Friday to facilitate this work. Westbound vehicles will be detoured south on Black Creek Dr. Noise from construction equipment and activities can be expected


Hours of Work​

  • Work will take place Monday – Friday, July 26 - August 13, 2021.
  • Work will take place between 8:00 pm and 6:00 am
  • Work may be rescheduled due to unforeseen circumstances
  • The contractor may not always work during the permitted hours but may do so at its discretion
  • This work may take longer or shorter than expected

Traffic Details​

  • Advanced notification signs will be installed on Eglinton Ave W and Black Creek Dr.
  • The westbound lane of Eglinton Avenue W between Black Creek Dr and Weston Rd will be closed nightly from July 26 - August 13, 2021.
  • Closures will be in place Monday – Friday.
  • Westbound vehicles will be detoured south on Black Creek Dr.

Pedestrians Details​

  • No pedestrian impacts are associated with this work​


Transit Information​

  • The westbound TTC bus stops on Eglinton Ave W will be temporarily relocated to the south side of Eglinton Ave W at Black Creek Dr, and the west side of Weston Rd between 8:00 pm and 6:00 am on the specified dates [TTC route 32 / 332 WB]
  • The southbound bound TTC bus stop on Black Creek Dr will be temporarily relocated to the south side of Eglinton Ave W between 8:00 pm and 6:00 am on the specified dates [TTC routes 71 SB & 171]
  • The southbound TTC bus stop on Weston Rd will be temporarily relocated to the north side of Lambton Ave between 8:00 pm and 6:00 am on the specified dates [TTC route 71 SB]
  • The northbound TTC bus stop on Weston Rd will be temporarily relocated to the south side of Eglinton Ave W between 8:00 pm and 6:00 am on the specified dates [TTC route 171]
  • Please review the TTC detour maps below
 
They should do a drone video showing how the buses would navigate the roadway to and from the terminal.
The station is rather... dark. Especially in the bus terminal concourse connection. I hope the brightness of these lights are adjustable, because I'm not seeing any connection points for additional lighting.

Screen Shot 2021-07-28 at 10.00.26 PM.png
 
July 29
No testing for sometime as a lot of work still needs to be done with the bulk being west of Victoria Park today.

The east end of Golden Mile eastbound platform is the test bed for grass in the ROW with a small section of grass down. To the east of it, there is more dirt in the ROW with sprinklers about 20' apart in the outside rail only for both tracks. A few need to be lower as they are above the rail. There is a full wide concrete walkway about 200' from the station with dirt on both side of it and don't see another in that block area at this time. The dirt ends about haft way where fiber material being lay and anchor down.

The outside rail has the same molding found in concrete road crossing and well anchor down.

Where the LRV's off loaded, part of the wooden deck has been remove to add more concrete to the east than before. A large area on the opposite side of the road crossing has seen exiting concrete removed and new concrete pour. Still a war zone going toward Kennedy Rd for pedestrians as road curb being with with some sidewalk on the south side.

You can use the south sidewalk for the overpass at Kennedy Station area, but handrail waiting to be install on the driveway retaining wall along with landscaping. A barrier still to be built west of the overpass.

More on Kennedy in its own thread later.

Enjoy fast jump photos not fix or tag right
51343772818_6081eee407_b.jpg

51342829832_c98e4a316b_b.jpg

51343544331_ee19090ef8_b.jpg

51342830027_18eb162357_b.jpg

51343544506_9b68e2d351_b.jpg

51344292504_624dbf97d5_b.jpg

51342831232_4e3078636b_b.jpg

51343773208_d2bb09d5b7_b.jpg
 
July 29
No testing for sometime as a lot of work still needs to be done with the bulk being west of Victoria Park today.

The east end of Golden Mile eastbound platform is the test bed for grass in the ROW with a small section of grass down. To the east of it, there is more dirt in the ROW with sprinklers about 20' apart in the outside rail only for both tracks. A few need to be lower as they are above the rail. There is a full wide concrete walkway about 200' from the station with dirt on both side of it and don't see another in that block area at this time. The dirt ends about haft way where fiber material being lay and anchor down.

The outside rail has the same molding found in concrete road crossing and well anchor down.

Where the LRV's off loaded, part of the wooden deck has been remove to add more concrete to the east than before. A large area on the opposite side of the road crossing has seen exiting concrete removed and new concrete pour. Still a war zone going toward Kennedy Rd for pedestrians as road curb being with with some sidewalk on the south side.

You can use the south sidewalk for the overpass at Kennedy Station area, but handrail waiting to be install on the driveway retaining wall along with landscaping. A barrier still to be built west of the overpass.

More on Kennedy in its own thread later.

Enjoy fast jump photos not fix or tag right
51343772818_6081eee407_b.jpg

51342829832_c98e4a316b_b.jpg

51343544331_ee19090ef8_b.jpg

51342830027_18eb162357_b.jpg

51343544506_9b68e2d351_b.jpg

51344292504_624dbf97d5_b.jpg

51342831232_4e3078636b_b.jpg

51343773208_d2bb09d5b7_b.jpg

Really good to see the idea of the non-concrete (grass/softscape) ROW move towards fruition.
 
The station is rather... dark. Especially in the bus terminal concourse connection. I hope the brightness of these lights are adjustable, because I'm not seeing any connection points for additional lighting.

View attachment 337882

These ML concourses don't even look really look like rapid transit stations with those white walls. They look like the interiors of institutional buildings
 