July 29
No testing for sometime as a lot of work still needs to be done with the bulk being west of Victoria Park today.
The east end of Golden Mile eastbound platform is the test bed for grass in the ROW with a small section of grass down. To the east of it, there is more dirt in the ROW with sprinklers about 20' apart in the outside rail only for both tracks. A few need to be lower as they are above the rail. There is a full wide concrete walkway about 200' from the station with dirt on both side of it and don't see another in that block area at this time. The dirt ends about haft way where fiber material being lay and anchor down.
The outside rail has the same molding found in concrete road crossing and well anchor down.
Where the LRV's off loaded, part of the wooden deck has been remove to add more concrete to the east than before. A large area on the opposite side of the road crossing has seen exiting concrete removed and new concrete pour. Still a war zone going toward Kennedy Rd for pedestrians as road curb being with with some sidewalk on the south side.
You can use the south sidewalk for the overpass at Kennedy Station area, but handrail waiting to be install on the driveway retaining wall along with landscaping. A barrier still to be built west of the overpass.
More on Kennedy in its own thread later.
Enjoy fast jump photos not fix or tag right