Voltz
Senior Member
I'm going for July 1st, three months after we can expect an announcement
|
|
|
The only form of staggered opening you'll see is between the openings of the Crosstown West project and the core Crosstown project. Asides from that, there will be no staggered opening.I think they stagger the openings to try and extend the much needed good press.
Perhaps not the good press so much as the bus routing changesI think they stagger the openings to try and extend the much needed good press.
Given the construction context, I doubt there are many points of comparison to make a cost comparison helpful. Many of the Crosstown stations are being constructed in difficult contexts with adjoining buildings needing to be underpinned, plus two interchanges with existing tunnels. What would the TYSSE equivalent of the Salvation Army premises re-building be?Does anyone have a comparison of the cost of an average underground Crosstown station versus the bigger and more opulent York Spadina subway extension stations?
Doubtful haha, the TTC finally fixed the lights at leslie and they're on 24/7 don't want to look the gift horse in the mouth and complain thoughDon't assume that just because it isn't remedied, it hasn't been noted or examined. Five years is a long time, but even so - the cost of five years' wasted energy versus the cost of a day's delay in the project - I'm content if they are simply letting this one stand while they attack other things.
- Paul
I assume the tunnel lights will always be ON and this is considered part of the tunnel for daylighting.View attachment 548843View attachment 548844
I wonder if they'll ever address this difficiency. These 4 lights have been perpetually on 24/7 ever since they were installed about 5 years ago. Ice raised this to ML before via their X page but theve never looked into it...
probably to avoid shadows being cast on te area possibly by one of the switches?I assume the tunnel lights will always be ON and this is considered part of the tunnel for daylighting.
Though the proverbial "big bang" opening would be quite something too.I think they stagger the openings to try and extend the much needed good press.
Well I think the opening date will get "leaked" under a metrolinx email newsletter a month before its official announcement then they'll try to hide it until then to stir up even more good press.I think they stagger the openings to try and extend the much needed good press.
how long is it expected to take to tunnel? were there any reported delays?West extension is still tunneling, 2025 opening is impossible.
as long as they dont hold back a either of the lines to open just for political browny points. that would be criminalThe only form of staggered opening you'll see is between the openings of the Crosstown West project and the core Crosstown project. Asides from that, there will be no staggered opening.
It's in the final stretch now, TBMs are passing Royal York and are less than a kilometer from the extraction site.how long is it expected to take to tunnel? were there any reported delays?