BurlOak
Senior Member
The thing I wonder is under what political scenario could someone actually promise to correct this mistake.We'll be paying for the Leslie mistake in tax dollars in the future, I have no doubt about that.
Probably when the DRL reaches Eglinton and suddenly Metrolinx/TTC realize they need to short-turn vehicles at Don Mills rather than at Laird.
- First, maybe a campaign promise to extend the DRL to Sheppard.
- Then, highlight how short sighted government was to not plan ahead with a station rough-in.
- Follow that up with acknowledgement that ECLRT on street through Leslie also hurts the connectivity of the transit network.
- Promise to grade-separate ECLRT.