Experts offer ideas on how to fix the dangerous intersection of Eglinton & O'Connor Dr. Which frankly should be implemented all over Scarborough.

https://www.thestar.com/news/pedest...tersection-at-eglinton-and-victoria-park.html



Untitled.png
 

Attachments

  • Untitled.png
    Untitled.png
    793.5 KB · Views: 380
Experts offer ideas on how to fix the dangerous intersection of Eglinton & O'Connor Dr. Which frankly should be implemented all over Scarborough.

https://www.thestar.com/news/pedest...tersection-at-eglinton-and-victoria-park.html

View attachment 93846

These are all good best practices for pedestrian safety, however, it's disappointing that the experts didn't provide any solutions that would improve this unique intersection. The worst part of it is actually at Eglinton/O'Connor and they didn't even touch on that. I think making the curve tighter where O'Connor meets Eglinton and aligning it with the driveway on the northside would have the most significant improvements. Since it would narrow the overall intersection of O'Connor/Eglinton. It would reduce the free flow of traffic from O'Connor north to Eglinton East thereby slowing cars down and giving pedestrians less road surface to cross.
 
  • Like
Reactions: BMO
These are all good best practices for pedestrian safety, however, it's disappointing that the experts didn't provide any solutions that would improve this unique intersection. The worst part of it is actually at Eglinton/O'Connor and they didn't even touch on that. I think making the curve tighter where O'Connor meets Eglinton and aligning it with the driveway on the northside would have the most significant improvements. Since it would narrow the overall intersection of O'Connor/Eglinton. It would reduce the free flow of traffic from O'Connor north to Eglinton East thereby slowing cars down and giving pedestrians less road surface to cross.

What you're suggesting appears to be part of the plan. I couldn't find more detailed drawings that show the smaller details such as curve radii, however I found this.


Untitled.png

http://lrt.daxack.ca/blog/presentations/EglintonCrosstownReport/ttr_epr_2010-03-09-section-3-e.pdf
 

Attachments

  • Untitled.png
    Untitled.png
    864.1 KB · Views: 236
You can already tell that the turn radii are still quite oversized in that drawing.
That southeast corner of Vic Park and Eglinton is exceedingly poorly designed for what is direct access to the LRT platform. They need to axe that stub lane on Eglinton, and tighten that right turn, since basically everyone who would turn right on to Eglinton will be turning right on Eglinton Square first.
 
Agreed that it has been public knowledge for a long time. But again, it has not been officially announced as going forward to construction. Just gotta wait for that del Duca presser.

Um, ok, well, construction already technically started with the temporary relocation of the Kodak building, which is to serve as the GO ticketing hall.

It's officially happening. It's in the Project Agreement (PA), which is the contract between Metrolinx/Infrastructure Ontario and Crosslinx Transit Solutions, therefore it is funded, and detailed design is already well underway, likely nearing 90% by now, given the progress on the stations I'm actually involved with.

Del Duca's announcements are technically meaningless. They are 100% for show. Whether he made one, or he makes one for Mount Dennis GO is not relevant to the status of the project.
 
Um, ok, well, construction already technically started with the temporary relocation of the Kodak building, which is to serve as the GO ticketing hall.

It's officially happening. It's in the Project Agreement (PA), which is the contract between Metrolinx/Infrastructure Ontario and Crosslinx Transit Solutions, therefore it is funded, and detailed design is already well underway, likely nearing 90% by now, given the progress on the stations I'm actually involved with.

Del Duca's announcements are technically meaningless. They are 100% for show. Whether he made one, or he makes one for Mount Dennis GO is not relevant to the status of the project.

You guys are taking me way too seriously. I know it's 'happening.' I'm just saying a bunch a bureaucrats at the TTC were hesitant to put a GO symbol beside Mt Dennis on the map because del Duca didn't have a presser yet.
 
A heads up.

Keelesdale Station Traffic Reconfiguration - Thursday December 22, 2016 (overnight)

From link.

...As part of the continued traffic staging set up at Keele Street/Trethewey Drive and Eglinton Avenue West for support of excavation works for the Keelesdale Station traffic restrictions in this area is changing.

To support the temporary shoring and excavation works for the North side of the Keelesdale Station, crews will be shifting or flipping traffic to the south from the north along Eglinton Avenue West...


keelesdale_traffic_reconfiguration.jpg


Hours of Work
  • The work will occur between 7:00 pm Thursday 22nd and 7:00 am FridayDecember 23rd2016.
  • Please note that work could be rescheduled due to weather conditions or unforeseen circumstances.
Traffic Details
  • Keele/Trethewey North and South of Eglinton will be reduced to 1 lane in either direction.
  • Southbound right turn from Trethewey onto Eglinton will be restricted.
  • A northbound right turn lane from Eglinton onto Trethewey and a southbound left turn lane from Trethewey onto Eglinton will be maintained via a dedicated lane.
  • During Stage 3 and 4, the Traffic along Eglinton will maintain 1 lane in each direction with the traffic shifting to the South from the North.
  • Left/right turns restricted at the intersection of Keele and Eglinton.
Yarrow Road
  • Please note that Yarrow Road at Eglinton Avenue West is now open.
Access to Green P Lot
  • The driveway on Eglinton Avenue West is now open.
Pedestrian Details
  • The pedestrian crossing on the east side of Keele Street/Trethewey Drive will be closed.
  • All other pedestrian walkways will remain open.
 
  • Like
Reactions: PMT
Roughly 194,000 people per day in 2031 for ththe Crosstown west and east.

45,000 people per day are expected to use Crosstown East - the same ridership as the Sheppard Subway

For the entire Crosstown, that adds up to 239,000 people per day in 2031.
 
I'd be curious to know what is the expected daily ridership of the crosstown? Both Toronto Subway lines have alot of off peak ridership, is the same expected here?
It is fascinating a bit to compare the Crosstown to the Relief Line.

The Relief Line (lets say the Long route to Sheppard) has peak hour ridership that is comparable to the Bloor-Danforth line, but it's daily ridership is substantially less than Bloor-Danforth, lower than even that of the Crosstown..

The Crosstown meanwhile has lower peak hour ridership than either line, but it's daily ridership is very big, especially compared to that of the Relief Line.

This would indicate that the Crosstown will be actively used throughout the day while the Relief Line will have a largely peak-hour ridership demand. (Although, trip patterns might change should the Relief Line open, disproving this peak-hour notion entirely for all we know.)
 
It is fascinating a bit to compare the Crosstown to the Relief Line.

The Relief Line (lets say the Long route to Sheppard) has peak hour ridership that is comparable to the Bloor-Danforth line, but it's daily ridership is substantially less than Bloor-Danforth, lower than even that of the Crosstown..

The Crosstown meanwhile has lower peak hour ridership than either line, but it's daily ridership is very big, especially compared to that of the Relief Line.

This would indicate that the Crosstown will be actively used throughout the day while the Relief Line will have a largely peak-hour ridership demand. (Although, trip patterns might change should the Relief Line open, disproving this peak-hour notion entirely for all we know.)

That would be one reason. The other is the distribution of demand. On the Relief line, the vast majority of riders will use the busiest section feeding into downtown, and contribute to the peak demand.

But on the Crosstown, the travel patterns will be much more diverse. Some riders will take it to the Eglinton/Yonge station, some to Eglinton West, others will go to Kennedy, and yet another group will take it to the Mt Dennis station if the RER / SmartTrack service is worth taking. Furthermore, some of the riders will not transfer to any subway or RER, but will just travel along Eglinton.

Riders that do not use the busiest section of the line, or ride that section in the counter-peak direction, do not affect the peak ridership at all.

But, they still count towards the daily ridership.
 
Just curious I don't know if this has been asked anywhere but will the crosstown be operated like the subway system and be closed for a few hours in the erly morning or will it be all day service like the streetcar network is?
 
It should be interesting to see what happens when the capacity here is exceeded as they will likely have to find a built solution with ATO already coming from day 1.
Any riders whose origins or destinations are not on Eglinton can ultimately be rerouted off of the Crosstown. All downtown bound passengers, for instance, should eventually be getting intercepted by all the GO lines or the DRL, relieving pressure on the central Eglinton section.

It's going to be a very long time before ridership, where origins and destinations are both on Eglinton, exceeds the capacity of ATO 3-car LRVs.
 