I was in the Yonge and Eglinton area today and a head scratching visit, The hording around the elevator and escalator from TTC platform to the LRT or to the concourse is mostly removed now with fencing in its place. Lots of work still to be done on all levels including the overhead ceiling as well flashing.
It would be nice to get the tunnel back though it will be an L shape compared to what it was before. Will not be going through the food court area anymore as it has been reduced in size and it will be a straight walk to the new LRT entrance.
Lots of sidewalk work still to be done for pouring the concrete base that will support the pavers that will be placed on top of the concrete.
Not all the bike lanes are in place yet and all of it still needs to see asphalt topcoat especially where the bus stops are located.
Part of the sidewalk by the new LRT entrance is still seeing waterline work or X that needs to be backfill and then have concrete pour for it.
We should see no construction for the sidewalks and bike lanes by June with the hope it will happen a lot sooner.
Until the access to the LRT station from TTC line 1, stations, we may see some hint when it will be completed come June.
Photos to follow with an unknown timeframe at this time, as I have overv1,000 in my backlog currently.
I was in the Yonge and Eglinton area today and a head scratching visit, The hording around the elevator and escalator from TTC platform to the LRT or to the concourse is mostly removed now with fencing in its place. Lots of work still to be done on all levels including the overhead ceiling as well flashing.
It would be nice to get the tunnel back though it will be an L shape compared to what it was before. Will not be going through the food court area anymore as it has been reduced in size and it will be a straight walk to the new LRT entrance.
Lots of sidewalk work still to be done for pouring the concrete base that will support the pavers that will be placed on top of the concrete.
Not all the bike lanes are in place yet and all of it still needs to see asphalt topcoat especially where the bus stops are located.
Part of the sidewalk by the new LRT entrance is still seeing waterline work or X that needs to be backfill and then have concrete pour for it.
We should see no construction for the sidewalks and bike lanes by June with the hope it will happen a lot sooner.
Until the access to the LRT station from TTC line 1, stations, we may see some hint when it will be completed come June.
Photos to follow with an unknown timeframe at this time, as I have overv1,000 in my backlog currently.