News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.2K     0 

I wonder if Metrolinx owning and operating the Eglinton LRT is a 'test case' for Metrolinx eventually uploading the TTC system, or at least the subway system. If they have experience running a local rapid transit line (ie not GO), then that will give them some more credibility if the time comes that they're to assume control of all or part of the TTC system.

I wonder if anyone is even thinking this far out.
 
Or rather in running Hamilton, Mississauga, Waterloo lines?

Wait is Metrolinx involved with Waterloo?

Hamilton and Mississauga I can definitely see (although I don't think it's been confirmed one way or the other). Waterloo I'm not sure, although I would suspect it would likely be GRT, as the connections between GRT and other GTHA systems is virtually non-existent. The only transit connection to the "outside world" in that case is GO.

I wonder if anyone is even thinking this far out.

I would hope that Metrolinx is. Firstly, they need a dedicated revenue stream. Once they're sure they can upload local agencies (or parts of local agencies) under their jurisdiction without being subject to the whims of Queen's Park, I suspect we'll start to see that begin.
 
Waterloo is tendering out the Design-Build-Finance-Operate-Maintain aspects of their LRT project. They only hitched onto Metrolinx' vehicle order.
 
I've scraped this together. I'm not going to claim that this hastily put together list is 100% accurate. But it should give us a good overview of where money has come from.

It looks like the City of Toronto (or any preceding municipality) was involved in funding 8 of the 12 subway expansions in Toronto. the entire 30 km Yonge-University-Spadina line was built with municipal transit taxes and TTC surplus, with the exception of a small amount of corporate and provincial funding for the University Subway. The Province of Ontario has assisted with funding with 5 of the 12 subway projects. The City of Toronto exclusively funded 6 of the 8 projects it contributed to. The Province of Ontario exclusively funded 2 of the 5 it's been involved in.

So it looks like the City of Toronto and Province of Ontario have each built more or less half of subway network. The City building Yonge-University-Spadina and the province building the Scarborough RT and the largest chunk of the Bloor-Danforth. They were also responsible for the Sheppard Boondogg... Stubwa... Subway if that counts for anything (it should count against them :confused:)

Yonge (Union to Eglinton): City of Toronto
University: City of Toronto, Province of Ontario, Private Donations
Bloor-Danforth (Keele to Woodbine): Province of Ontario
Bloor-Danforth (Keele to Islington, Woodbine to Warden): Metro Toronto, Province of Ontario
Bloor-Danforth (Woodbine to Kennedy, Islington to Kipling): Metro Toronto
Yonge (Eglinton to York Mills): Metro Toronto
Yonge (York mills to Finch): Metro Toronto
Spadina (St. George to Wilson): Metro Toronto
Spadina (Wilson to Downsview): Metro Toronto
Scarborough RT: Province of Ontario
Sheppard Subway: Province of Ontario

That's not quite how it happened....

The TTC and the City teamed up for the original Yonge segment and the University Line, which was actually the first phase of the Bloor-Danforth. The second phase was from St. George to Greenwood, with the third extending it to Jane and Woodbine, and a fourth unfunded phase extending it further to Warden and Islington. The Province chipped in some funding, which allowed the second and third phases to be completed simultaneously, and the fourth phase to be built.

After that, all of the extensions built until the 1980 openings received funding from both Metro and the Province, usually something around a 50/50 split. The SRT was the first wholly-funded Metro project - until the Province sunk their claws into it and paid for all of the conversion costs to ICTS. Downsview and Sheppard were both jointly funded, with the Province contributing the majority of funding (although the Feds did chip in land for Downsview, and some small percentage of funding for Sheppard).

Dan
Toronto, Ont.
 
That's not quite how it happened....

The TTC and the City teamed up for the original Yonge segment and the University Line, which was actually the first phase of the Bloor-Danforth. The second phase was from St. George to Greenwood, with the third extending it to Jane and Woodbine, and a fourth unfunded phase extending it further to Warden and Islington. The Province chipped in some funding, which allowed the second and third phases to be completed simultaneously, and the fourth phase to be built.

After that, all of the extensions built until the 1980 openings received funding from both Metro and the Province, usually something around a 50/50 split. The SRT was the first wholly-funded Metro project - until the Province sunk their claws into it and paid for all of the conversion costs to ICTS. Downsview and Sheppard were both jointly funded, with the Province contributing the majority of funding (although the Feds did chip in land for Downsview, and some small percentage of funding for Sheppard).

Dan
Toronto, Ont.

Wow. If I'm understanding correctly, it looks like most of Toronto's subways were paid for by the City and partly paid for by transit taxes. I would not have expected that based on the conjecture at City Hall

Do you know how much funding the province chipped in for phase two and three of the Bloor-Danforth?

If Chow and Tory do push additional transit taxes they really need to drill this into the head of Torontoninas: The entire Yonge-University-Spadina and most of the Bloor-Danforth was paid for and built by the City of Toronto using transit taxes (with a small amount of TTC surplus and donations). Transit expansion in Toronto stopped once we started depending on the province.
 
Today Yonge-Eglinton Station looked as busy as Yonge-Bloor. :eek:

Probably an anomaly due to delays somewhere else, but given the little standing room and the addition of an interchange, a station redesign as part of the ECLRT is definitely in order.
 
I just received this letter in the mail.

Oh3ig5V.jpg

08jExAy.jpg


and a close up on the launch shaft:

yeTnHf9.jpg


Still no dates for when construction starts....

Also of note, the total lack of any TTC symbolism! But I guess that is to be expected.
 
Last edited:
Today Yonge-Eglinton Station looked as busy as Yonge-Bloor. :eek:

Probably an anomaly due to delays somewhere else, but given the little standing room and the addition of an interchange, a station redesign as part of the ECLRT is definitely in order.

I honestly think if the Malvern LRT and Eglinton West are built Yonge Eglinton will become as busy as Yonge Bloor
 
Wow. If I'm understanding correctly, it looks like most of Toronto's subways were paid for by the City and partly paid for by transit taxes. I would not have expected that based on the conjecture at City Hall

Do you know how much funding the province chipped in for phase two and three of the Bloor-Danforth?

If Chow and Tory do push additional transit taxes they really need to drill this into the head of Torontoninas: The entire Yonge-University-Spadina and most of the Bloor-Danforth was paid for and built by the City of Toronto using transit taxes (with a small amount of TTC surplus and donations). Transit expansion in Toronto stopped once we started depending on the province.

So what has happened since for the city and TTC to continually say there is no money to build subways
 

Back
Top