smallspy
Senior Member
It seems like there were at least two different purposes to the replaced concrete.I didn't see anything visibly wrong with the concrete they replaced and assumed, perhaps wrongly, that they were opening it to run a cable. The bigger issue is what seems like a 10 degree slope on the bike lane towards the road, and signs mounted right next to the sidewalk (protruding onto the sidewalk) but not above 6'6" so at some point someone will cut their head.
At a couple of the locations, I saw them installing some sort of membrane at the bottom.
The one furthest east in front of 300 Eglinton was a small length between two previously replaced panels, and was a tripping hazard. I wonder if this was also the case for one of the replacements on the west side of Mt Pleasant.
For the record, all of the concrete was poured yesterday, and should be made accessible today - I haven't gone out yet today to see if they've pulled down the caution tape.
Dan




