looks like they're two floors down in the middle. Amazing how quickly this thing can dig. At this speed they should be at the bottom sometime mid August. Although they still have a quite a number of soldier beams left. Surplus? or are there really stilll this many holes to drill. A question that I've always had with anchoring is that this project is supposed to go down 5 levels. The soldier beams, however, don't look anywhere near long enough to go down that far. Do they stack soldier beams?
I went to walk around the site today. It looks like they've spread some rought concrete at the north west entrance. It looks like pavement, but looks too rough and too thin to be of use. Anyone know what they're trying to do?