July 4th update:

- Building the first floor
- Construction up top by the south-east entrance of the Yonge-Sheppard station

July%2525206%2525202011%252520pano.jpg


DSC_0611.JPG


DSC_0604.JPG
 
July 6th update:

- Second floor in progress
- Something with a lot of re-bar

pano.jpg


- Second floor continues
DSC_0616.JPG


- Something requiring lots of re-bar
DSC_0617.JPG
 
The rectangular pit with all that re-bar looks like it is probably the elevator pad for the South tower. You can see the placement for those elevators in the top left corner of this plan from the Hullmark website. The smaller square pit with the re-bar will most likely be for the Tower crane, yet to be installed.

amenityplan_1100.jpg

(Image from Hullmark website located here: http://www.tridel.com/hullmarkcentre/amenities.php )
 
Last edited:
July 13, 2011 Updates:
- new crane base
- second floor has been poured and getting ready for third
- appears there about about 60-70 people working each day

DSC_0626.JPG

DSC_0627.JPG

DSC_0629.JPG

DSC_0630.JPG

DSC_0631.jpg

DSC_0632.JPG

DSC_0633.JPG

pano.jpg
 
^ 4 levels I think.

The construction ramp in the northeast corner is pretty much gone. Looks like only a little bit left to excavate then I assume the southeast ramp will be removed. Looks like a third crane will be put up soon in the northwest quadrant. They have recently dug out the base
 
July 25th Update:

- Second floor columns are up and side wall is poured
- 3rd crane base is in

DSC_0644.JPG

.
July%25252025%252520Pano.jpg
 
too bad for the west facing residents in Spring...
bye bye view... hello office tower/condo...

well, the view isn't amazing to begin with, facing the former plaza below, with numerous empty parking spaces on either side of Yonge-street.... Yonge/Sheppard definitely isn't the prettiest intersection in NYCC, i think it might just be more lively when Hullmark is built...
 
July 25 Pictures - From Ground

Hullmark-2011-07-25-1.jpg
Hullmark-2011-07-25-2.jpg


Cell phone view from street level.
 

Attachments

  • Hullmark-2011-07-25-2.jpg
    Hullmark-2011-07-25-2.jpg
    92.6 KB · Views: 292
  • Hullmark-2011-07-25-1.jpg
    Hullmark-2011-07-25-1.jpg
    93.8 KB · Views: 296
Doesn't seem like much is changing on the site.
Work continues on the north side of the dig.

More footings
DSC_0650.JPG


A new subway entrance
DSC_0653.JPG


Pano%252520Aug%25252012%2525202011.jpg
 
Hopefully though the two buildings will cut down the noise from the Yonge and Sheppard intersection. I find that there is a lot of motorcycle and firetruck noise. The view is 'OK', not really that great to begin with.
 

Back