Transportfan
Senior Member
So what's that being built there in those pics?
So what's that being built there in those pics?
But Drum said it's not the carhouse.
I never said the steel wasn't the carhouse. That is the carhouse being built and I posted photos of it on Dec 18 in this thread. One of the photos shows why the carhouse can't go in the Hydro corridor. That is the only location where land is cheap and you can't put other things on it. The Hydro corridor is unusable and the land next to the 407 is for the 407 BRT. That leaves a section between them for the carhouse.But Drum said it's not the carhouse.
That’s a great find! Thanks for posting.Noticed this in the latest Metrolinx wayfinding design guidelines:
A sneak peak at preliminary(?) branding for the Hurontario Line (and also the Ontario Line and cancelled Hamilton Line)
View attachment 295832
View attachment 295833
The last I heard, Central Parkway will be the stop location. Have requested full stop locations as well asked if Steeles will be relocated to the north side as originally plan. Big mistake if not relocated now as we are only talking about 500' of guideway and track. Extra cost added to contract by change order or Brampton picks up the cost since they caused the problem in the first place.is the Fairview LRT stop located at Fairview or at Central Parkway?