drum118
Superstar
Stuff like this is why we need Metrolinx...
Metrolinx is pushing BRT 100% for Hurontario and that a mistake. Brampton has been bushing BRT and that why MT has a 102 on the road today. Ridership numbers for 2031 clearly show LRT is needed.
2031 Ridership numbers going north from Dundas is less than it will be in 5 years for peak time and we are 80% there today
Brampton has been looking at moving GO and transit to the old hospital site. Goes against a lot of things for Downtown Brampton.
I found the turn out very light.
Lots of new stuff and you need the 2 hours to get a handle on it.
About 12 options for Sq One for doing transit and goes against the Downtown 21 thinking. A number of options for Brampton Downtown also.
65% of existing stops will be remove and how to connect to some east-west routes are missing to the point you will have to walk a block or 3 minutes to get to them.
A large number of riders will end up walking 1,500m to a stop base on how the roads off Hurontario are layout. A number of real trip generator stop are gone and place at low ones like TLK students will have to wak to/from Dundas or the Cooksville GO stop as Hillcrest and the stop next to the school is gone. There is no stop for a school in Brampton and the stops are more like 700m apart with a nice big gap between them outside the radius area.
Centre of the road is what been call for. The idea of on one side of the road has been dismiss and don't buy the reason. Need to bring the West 8 team doing the waterfront to show how it should be done.
Not sure when the boards will be on line.
I will be at Brampton PIC as I have a number of Question to ask.
The final recommendation for LRT or BRT will be done in the fall. THere is a push by many that it should be LRT.