Excavation of the ramp is now complete, and initial footings and foundation work in the former ramp area is now underway. Forming, rebar, and the steel anchoring frame for the crane base for the second crane are now in place, waiting on the concrete to be poured. Assuming no unusual delays, the next crane, in the south-east section of the site, should be up in a week or so.