Fri Oct 2, 2020

Assembling the bracing structure.

FF3BC791-A38E-40C0-B0F0-9BAC89600A38.jpeg



D841FCF7-45FD-4555-8D1B-2FC36A93AC8A.jpeg
 
After looking through all pages of this thread, I haven't come across a link to the final staff report. Would anybody be able to point me in the direction of where I'd be able to find it?
 

I assume this is going to be a similar platform for the excavation similar to other ones in the city i.e. The One and The Taylor down the street ( I know there are others as well)

Definitely one to watch with all the heritage buildings (façades) being kept for this one.

@Red Mars Nice vantage point, hope you have this access the whole project.
 

Back
Top