IMG_3697.jpeg
IMG_3695.jpeg
Reaching the halfway point - should start to see the "mountains" become more clearly defined as they move up from here
 
Friday, January 12 - lots of formwork going on at King Toronto - a number of construction workers on site. First picture is from a new vantage point, with King Toronto having reached the height that it is visible from our building. The rest of the photos are from street level, working from west to east on King Street, and then from the south or Wellington Street side.

20240112_110018.jpg



1000003108.jpg


1000003111.jpg


1000003110.jpg


1000003116.jpg



1000003112.jpg



1000003117.jpg


1000003124.jpg
 

Attachments

  • 20240112_154314.jpg
    20240112_154314.jpg
    332 KB · Views: 17
  • 20240112_161359.jpg
    20240112_161359.jpg
    352.6 KB · Views: 19
  • 20240112_120005.jpg
    20240112_120005.jpg
    342.8 KB · Views: 16
  • 1000003109.jpg
    1000003109.jpg
    337.7 KB · Views: 18
The construction fanboy in me can't get over how cool these zigzag building forms look right now!
I just feel bad for the Structural EIT that had to detail those slab edges.

Every time there's a vertical discontinuity, it would result in a unique detail. I'd love to see the drawing set for this thing.
 
There is less terracing and step backs on the south side of the building so that side of the building is more uniform and repetitive compared to the other sides of the building. The building is more dynamic when viewed from King Street where the terracing is more varied and starting on lower levels.
 

Back
Top