I had to Google this and read up on it. Not uncommon with 2 towers or any designs sharing the same shoring wall. 2 towers in Toronto did this and I found an article on the process. One side builds a temporary bracing made of steel once lower concrete is poured and cured.I'm no engineer, but I'm also very much wtf about how they're proceeding with this. Can someone make it make sense? I feel like you would have gotten the parking levels done on the first one before going ham on the second- OR just dig out both sites at the same time- different developers be damned. I figure they've all got this worked out, but the digging and refilling on site we saw earlier gives me concern.
We were down looking at it last night. What were they thinking, design on facade on units. OMG, I hope it gets better.^ Thanks for the bonus glimpse of Aqualuna rising fast!
Wow. Is “starting from $919,900” the average these days? And does that mean we’re eventually getting a posh furniture store as podium retail instead of a Burger King?Taken from Lanterra's website. Crane will be up for a while
Occupancy Q1 2027
View attachment 514996