Halfway mark pretty much
Interim occupancy was estimated for Mar 2026. Does it look like it will be on time or delayed? Usually 6 months delay on occupancy is quite normal for pre-con.
It appears that way! Although the first 2 floors of the condo have higher ceilings too. The site planning drawing shows the townhouses should be at the 4th floor height of the condo.Townhouse are “luxury”,.. so higher ceiling height than condo. Here, 5th floor of condo seems blocked by 4th floor of townhouse