Oct 4, 2020

20201004_113030.jpg
20201004_113121.jpg
20201004_113124.jpg
20201004_113355.jpg
20201004_113426.jpg
20201004_113447.jpg
20201004_113534.jpg
20201004_113538.jpg
20201004_113622.jpg
 
Oct 31

Tower crane to come down this week as the jib crane in place to do it
50556851977_6ca69ffe5d_b.jpg

50556724591_e6ab0855ab_b.jpg

50556852132_61750e1f0d_b.jpg

50556852307_e1c696bc03_b.jpg

50555989158_dffff2af35_b.jpg

50555989263_f23eda0af2_b.jpg

50555989458_9db993a7e3_b.jpg

50556853092_733e4ef718_b.jpg

50556853202_9faa29e1e3_b.jpg

50556725811_f24c9ac5f4_b.jpg

50555990303_cab5ba1757_b.jpg

50556726191_543af19b47_b.jpg

50556720661_285d4e0c68_b.jpg

50556726311_bb728f5bc1_b.jpg

50556853822_8f7b6df383_b.jpg

50556853927_7451aac335_b.jpg
 
The grocery store is still moving forward. The building was designed for it on the second floor and an agreement was made with the retailer during the design development process.
The third floor is where this gym and wellness centre will be located.
 

Back
Top