Yeah...that doesn't look like it would take to sharp corners too well. >.<
 
July 9.

South Side of King Street:

20240709_114008.jpg


20240709_113909.jpg


20240709_113930.jpg


20240709_115023.jpg


North Side of King Street:

20240709_114024.jpg


20240709_115734.jpg


20240709_115628.jpg


20240709_115408.jpg


20240709_115450.jpg
 
July 11 - Structural steel arriving for the temporary construction enclosure building on the north side of King Street. Also a new construction contractor, E.S. Fox on site today (presumably for erection of the temporary enclosure building).

20240711_092521.jpg


20240711_092602.jpg
 

Attachments

  • 20240711_092518.jpg
    20240711_092518.jpg
    400.5 KB · Views: 43
July 16 - Structural steel for the temporary work shelter building is going up. (The 'temporary work shelter' is a bit of tongue in cheek - looks more robust and structurally sound than some permanent construction at a few other sites....)

20240716_075906.jpg


20240716_075955.jpg
 
July 16 - Structural steel for the temporary work shelter building is going up. (The 'temporary work shelter' is a bit of tongue in cheek - looks more robust and structurally sound than some permanent construction at a few other sites....)

View attachment 580766

View attachment 580765

I don't think they have a choice since it will have to support overhead cranes inside the enclosure.

AoD
 
Temporary here I presume means it will not be part of the project when completed.
 
July 17 - Work on the temporary structure continues to move quickly. Another load of steel beams was being delivered this morning, during ongoing installation of the beams from the prior delivery. On the other side of the site, the foundations for the south wall of the temporary structure are all complete, with the base plates ready, with bolts and their nuts waiting for the columns to be mounted.

20240717_080938.jpg
20240717_081002.jpg
20240717_081059.jpg



20240717_081131.jpg
 
July 19. A day of very impressive progress on the north side of Queen Street. This morning, the crew was working on the final, east-most section of the north wall steel girder structure (photos above). This afternoon, when we passed by around 4:30 PM, what looks to be almost the entire south side (King Street frontage) steel girder structure had been erected.

20240719_174226.jpg


20240719_174031.jpg
 
July 24: North side of King Street - Some infill sections have been added into the steel framework on both the south and north side structures. Additional steel girders have been delivered and are staged on the ground - some have a slight curve to them - will be interesting to see how they are positioned when they are installed.

20240724_171145.jpg


20240724_171211.jpg


20240723_151926.jpg


20240724_171036.jpg


South Side of King Street:

20240723_151849.jpg



20240724_174934.jpg
 

Attachments

  • 20240723_151819.jpg
    20240723_151819.jpg
    508.2 KB · Views: 38
  • 20240723_151936.jpg
    20240723_151936.jpg
    368.9 KB · Views: 30
  • 20240723_151935.jpg
    20240723_151935.jpg
    369.9 KB · Views: 30
  • 20240724_171123.jpg
    20240724_171123.jpg
    315.1 KB · Views: 28
  • 20240724_174907.jpg
    20240724_174907.jpg
    372.7 KB · Views: 37
The girders are not actually permanently curved, just not properly supported horizontally on the ground.
When installed vertically this afternoon they were perfectly straight.
 
The girders are not actually permanently curved, just not properly supported horizontally on the ground.
When installed vertically this afternoon they were perfectly straight.

With all due respect, while I am not a construction of engineering person, from my perspective:

1. The curved girders were not installed yesterday - they were still sitting on the ground this morning.

2. There is no way structural steel 'I' or 'H' beams, with substantial flanges along each side, will (in my humble opinion) curve due to lack of proper support. These girders were designed for structural rigidity. If they had curved after fabrication, there would be signs of buckling or rippling in the flanges along the concave sides of the girders - none visible. The only way these girders would bend like this is when they are being formed and still hot after being forged (or possibly being reheated).

North side photos - Girders are now up on the west side of the site, and a photo of the curved beams still resting on the ground. South site photos (below): Concrete pad being poured south-east corner for the dump truck exit onto Stewart Street - in preparation for the start of excavation activities.


20240726_083400.jpg


20240726_083328.jpg


20240726_082950.jpg


20240726_082935.jpg
 
2. There is no way structural steel 'I' or 'H' beams, with substantial flanges along each side, will (in my humble opinion) curve due to lack of proper support. These girders were designed for structural rigidity. If they had curved after fabrication, there would be signs of buckling or rippling in the flanges along the concave sides of the girders - none visible. The only way these girders would bend like this is when they are being formed and still hot after being forged (or possibly being reheated).
Beams often come pre-curved (camber) so that when they are installed, they deflect into straightness - most horizontal members are designed this way.

While designed not to buckle once installed, long members can absolutely deflect prior to installation. There are people who spend their entire career designing the temporary support systems for transporting structural members, such as bridge girders, so that they do not get damaged prior to erection. Another thing to note is that these very long slender components will often have additional supports once installed to prevent buckling, which are not present prior to installation.
 
Last edited:

Back
Top