there seems to be such a huge gap between these towers and the towers directly south. We went from towers in a park to towers in a parking lot.
 
there seems to be such a huge gap between these towers and the towers directly south. We went from towers in a park to towers in a parking lot.
That's Mississauga government for you 🤷‍♂️.
They want density, but they don't want to build a street grid.
They want a LRT but they don't want to reduce parking requirements.
It's just vertical subdivisions.
 
Maybe I’m in the minority here, but I quite like the clean and simple design of these.
I don't think the clean/simple design language is the big issue here. It stands out from everything else in the area and looks really nice compared to typical blue/green glass. The issue is that we started with a trio of themed towers that slowly degraded into three towers that have similar design elements, but don't really match each other.

The_Edge_R06-658x1024.jpg


43095-127086.jpg
 
Feb 21
As of Feb 24, the building is top off or is it?

By my count as well the elevator floor numbers, the building is 37 story and no different in floor height if the top floor is a mechanical floor.
51902714618_427f0037a2_b.jpg

51902952544_cc5fcd3817_b.jpg

51902623731_2ec9d65071_b.jpg

51901660312_6d134ace95_b.jpg

51902624001_4770fa6d48_b.jpg

51903294960_e686f94b5c_b.jpg

51901685982_052a16be21_b.jpg

51903294840_0f718bd0a6_b.jpg

51903294700_2661179738_b.jpg

51903170621_5bf576d11d_b.jpg

51903258783_c1f8e4d823_b.jpg

51903812860_de21e54126_b.jpg
 
I can see edge from my bedroom window and I haven’t seen the crane move in over a week. At least before that it was constantly at work.
 
I can see edge from my bedroom window and I haven’t seen the crane move in over a week. At least before that it was constantly at work.
It has been moving as I seen it do it as they are adding another floor or the Mech floor now.

Have not seen anything saying T1 is to be more than 35 floors, yet it is, but 36 floor is pour with the forming for the 37 on top of it. The 35th floor edge said more floors to come.

March 1
51913695092_da743b366f_b.jpg

51914658276_3355771168_b.jpg

51914658251_833ba9fc6a_b.jpg
 
It has been moving as I seen it do it as they are adding another floor or the Mech floor now.

Have not seen anything saying T1 is to be more than 35 floors, yet it is, but 36 floor is pour with the forming for the 37 on top of it. The 35th floor edge said more floors to come.

March 1
51913695092_da743b366f_b.jpg

51914658276_3355771168_b.jpg

51914658251_833ba9fc6a_b.jpg
The side panels are what I mostly used to see being moved up. This week I saw the crane lifting up some sort of pipes. I’m not sure.
 
Thats interesting. I didn't expect streets to be between the towers for some reason. I assumed the three towers would share one long laneway tucked behind Elm street to the three garages.
 