I have merged the Edge Towers and Oro at Edge Towers threads into one, as most members are not distinguishing between the second and third phases when posting photo updates. The Database files, the one for phases one and two, and the one for phase three (Oro), are now both attached at the top of each page of this combined thread.

42
 
So the second tower has topped out. I thought it being 10 floors taller would make it much taller than the first one (30 vs 40 floors which is 33% more.)

Edit: based on a rough count from the photos above, tower 1 is not 30 but 36 or 37 floors. The db info is still showing the original counts.
I'm pretty sure that phase one ended up as 35 storeys with 2 floors of mechanical penthouse above, while phase two has topped off with 40 storeys and 2 levels of mechanical penthouse above it!
 
I have merged the Edge Towers and Oro at Edge Towers thread into one, as most members are not distinguishing between the second and third phases when posting photo updates. Both Database files, the one for phases one and two, and the one for phase three (Oro), are now both attached at the top of each page to this combined thread.

42
@interchange42 thank you for this. In some cases separate threads are warranted but in this scenario when we have three buildings that are pretty much identical, being built almost simultaneously, a stone's throw apart, it just makes sense for one thread.
 
Jan 18
I shooting the elevator shaft from a distance and according to the floor markings on it, there are 40 residential floors as plan and 2 mechanical floors. To me, this is an 42 story building as every floor is part of the building regardless if its residential or not while UT and other places go by residential floors only.

Photos to follow.
 
Feb 6
@Paclo The Jib Crane was installed today to remove T2 tower Crane. The tower crane could be down this weekend or early next week

Photos to follow
 
Feb 6
Lot more up on my site shot from various locations for the day

The Jib Crane arrived as I was shooting the site
53515522056_20f00284c8_b.jpg

53515805209_85eaf81427_b.jpg

53515690423_0ee2c08a8f_b.jpg

53515690508_ca8517fe1e_b.jpg

53516222040_9f36133af7_b.jpg

53515958188_3f363ea22f_b.jpg

53514904387_38ca9cdba3_b.jpg

53516234715_1e294ebd01_b.jpg
 
Feb 8
Shot the tower from Dundas and had the boom on the Jib Crane and looks like it wasn't installed on the 6 when I shoot it
53521761003_04564da734_b.jpg


Feb 10
There are now 2 large Jib Cranes on the roof, not the standard Large with the small removing the large one.
53523708022_d50027c784_b.jpg

53525038295_a483af3798_b.jpg

53523738382_36f05301db_b.jpg

53523738372_dbeb164409_b.jpg
 
Last edited:
Feb 8
Shot the tower from Dundas and had the boom on the Jib Crane and looks like it wasn't installed on the 6 when I shoot it
53521761003_04564da734_b.jpg


Feb 10
There are now 2 large Jib Cranes on the roof, not the standard Large with the small removing the large one.
53523708022_d50027c784_b.jpg

53525038295_a483af3798_b.jpg

53523738382_36f05301db_b.jpg

53523738372_dbeb164409_b.jpg
How long until the new tower gets to grade
 
Feb 13
@Paclo T2 has lost the crane for it with the first part coming down Monday I expect and the rest today. No camera with me today to get shots of the last parts of it coming down.
 
So the podium should be done by Christmas. I’m really curious how this meets the street.
It is set back from the street by a fair distance like the other towers in the park around it.
 
It is set back from the street by a fair distance like the other towers in the park around it.
The petro Canada 70+ floor tower at burnamthorpe doesn’t have much room to be a tower in the park. What about 3606 Hurontario. I understand the towers on the east side which are decades old being a tower in the park but new ones not so much. Alba is start to change that error.
 