June 18
More up on my site

I am wrong as to where the ramp is to be and it will be off the service road from Kariya as well the drive way off Elm between T2 and T3
No idea why there will be about 20 foot cleaned between P2 and the surface for the west side that I originally thought was the ramp been built. Most or all of P2 will be pour by the end of the month leaving a small area for P1 to be pour in July
53803231503_fedc136215_b.jpg

53803316904_7951e9ca0e_b.jpg

53803231338_d814571c10_b.jpg

53803231223_bbabaf066f_b.jpg

53803425840_afaefcb850_b.jpg

53803231208_30a87ac83d_b.jpg
 
June 24
I have yet to see that jib crane in action and it still point east.

The sections that made up the daycare centre is being prepared to be remove from site.

More forming in place for the south end for P2, but not fully in place for all of it.

Photos to follow.
 

Back
Top