We might of found out about the slow pace:

http://thebulletin.ca/cbulletin/con...1177851813658997065&ctid=1000136&cnid=1002073

Was front page on the community newspaper - apparently the building cant be registered as completed until the Pedistrian Bridge is done, and its getting delayed because GO is concerened about vandalism to there trains by people throwing objects off the bridge.

Enclose the bridge with glass walls and a roof like the bridge crossing the tracks between the Skydome and CN Tower. Problem solved.
 
2009-04-18:
 

Attachments

  • DSC00733_s.jpg
    DSC00733_s.jpg
    57.8 KB · Views: 239
  • DSC00736_s.jpg
    DSC00736_s.jpg
    51.7 KB · Views: 240
  • DSC00739_s.jpg
    DSC00739_s.jpg
    64.4 KB · Views: 271
Nice pics...sorry for asking this question again, but is that large base/podium going up for Parade, not for both the taller towers?:confused:
 
Last edited:
Off topic posts have been moved here.

Please stay on topic.

42
 
May 18 2009 update

P A R A D E today ~

IMG_0363.jpg
 
If I'm not mistaken, long horizontal strips of pale-orange precast have started going up on the podium sections. That's what I saw from the Gardiner leaving Toronto on the Greyhound yesterday, at least. Looked pretty sexy.
 
yup sounds about right .... those orange precast strips in the podium are pretty consistant with the renderings

31406319bu5.jpg
 