Hello all, could anyone tell me whether this building is starting to look like the pictures? Curious to know the progress of construction.
 
The area of Carlton between Yonge and Jarvis has some of the most unfortunate buildings in Toronto. They should do something with the eastern blank wall facing Jarvis St. Its very unfortunate!

Actually one of my favourite streets in Toronto. Love the canyon street wall between Yonge and Church.
 
According to an item on CBC News tonight…

This residence conversion was supposed to be complete now "Opening August 2015", but it's not, and students are being put up in hotels here and there, by Knightstone. Knightstone is saying that City inspectors and the Fire Department haven't been it to give safety clearances. Students aren't being told when they'll be able to move in.

42
 
http://www.torontosun.com/2015/09/06/students-in-limbo-over-unfinished-residence

TORONTO - Dozens of post-secondary students could end up on the streets as their downtown residence is still under construction.

The Parkside Student Residence, formerly the Primrose Hotel — at Carlton and Jarvis Sts., is still a construction zone.

Matt Smith, of B.C., signed a contract in July for his daughter, who is a first-year Ryerson University film student.

“They guaranteed to be open Aug. 18, then it was pushed back to Aug. 27 and then to Sept. 2. They never communicated to us that the building wasn’t ready,” Smith said.

The private residence, which isn’t affiliated with any university, has been housing students in hotels, but that can’t last forever as it is high season for bookings.

“The building isn’t done yet. We are providing beds and food to the students, but that is all I can say,” said Samantha Cora, with Parkside Student Residence. She couldn’t give a date as to when the residence would be finished.

Smith’s daughter Alyssa was one of dozens of students put up at the Chelsea Hotel.

But with the busy convention season and events such as TIFF on the horizon, it’s not clear how long the students can stay as rooms are booked.

“I’m not able to provide details about our guests,” the Chelsea’s Tracy Ford said.

“This is a very busy time in the city with higher occupancy. I couldn’t say how long we can accommodate (the students).”

Smith’s contract with Parkside was for $1,250 a month, which included rent and a meal plan.

“They have just gone silent, gone dark and the building is only half done,” he said.

“They don’t answer calls. I have a year contract and it’s paid.”
 
OMG, colour in Toronto! Won't that hurt the children's eyes? That's just not acceptable in Toronto the grey!
 
The mural has started

P1070213.JPG
 

Attachments

  • P1070213.JPG
    P1070213.JPG
    249.6 KB · Views: 548
They’re adding yellow now. As per the rendering, orange should be next, then red and pink and maybe one more colour (different colour every 3 floors)
 
They work fast. First shots are from about 10:30am the last one was from about 8:30pm
D7B279D7-AD56-46AB-AE24-A97CE39730EB.jpeg
12DAFC15-02E4-471D-B574-19F38BE241E5.jpeg
F499D053-0009-4D78-BED7-74A01EC53987.jpeg
128433EC-62DC-4474-9C42-0359E93DE443.jpeg
59BC8F35-DAD0-460F-BA79-340300F2DFCA.jpeg
 

Attachments

  • D7B279D7-AD56-46AB-AE24-A97CE39730EB.jpeg
    D7B279D7-AD56-46AB-AE24-A97CE39730EB.jpeg
    284.5 KB · Views: 551
  • 12DAFC15-02E4-471D-B574-19F38BE241E5.jpeg
    12DAFC15-02E4-471D-B574-19F38BE241E5.jpeg
    305.3 KB · Views: 492
  • F499D053-0009-4D78-BED7-74A01EC53987.jpeg
    F499D053-0009-4D78-BED7-74A01EC53987.jpeg
    239.3 KB · Views: 510
  • 128433EC-62DC-4474-9C42-0359E93DE443.jpeg
    128433EC-62DC-4474-9C42-0359E93DE443.jpeg
    304.3 KB · Views: 521
  • 59BC8F35-DAD0-460F-BA79-340300F2DFCA.jpeg
    59BC8F35-DAD0-460F-BA79-340300F2DFCA.jpeg
    161.1 KB · Views: 469

Back
Top