Feb 27
6790771184_a6b02524b7_b.jpg


6936919711_0d3fef0873_b.jpg


6790804802_384d1cfd28_b.jpg


6790804364_506fb7ef3d_b.jpg
 
After seeing some of drums pics...is it my imagination or do things get build quicker in Mississauga. Gee this is already at 30 floors, Limelight is pretty well topped off
Crazy fast:eek::cool:
 
After seeing some of drums pics...is it my imagination or do things get build quicker in Mississauga. Gee this is already at 30 floors, Limelight is pretty well topped off
Crazy fast:eek::cool:

Its all in your mi....iind!! lol.:cool::eek:

Its taking the same amount of time as other places, but the good winter weather sure helping.

Based on Amacon track record for the 3 towers on Hurontario St, these are gang buster ones.

Wouldn't be many cranes in the sky later on this year, as well next, based on what the city is doing to slow it down. Can't wait until 2014 election to see some of these clowns get put out to pasture.
 
It'll be interesting to see the shorter buildings get built closer to the subdivision to the west.
 
Big, lofty windows, a nice site-plan with a corner building, high retail ceilings... this thing is more suitable for the urban environment than a lot of the condos we get in downtown Toronto! Good for MCC (and Amacon)!
 

Back
Top