Cassion drilling today, took a pic when the sun was out.
7F8BAE15-E49B-48FD-AB6D-2E09F0693279.jpeg
76726643-33E7-4422-BA1A-555CC8D5F60B.jpeg
 

Attachments

  • 7F8BAE15-E49B-48FD-AB6D-2E09F0693279.jpeg
    7F8BAE15-E49B-48FD-AB6D-2E09F0693279.jpeg
    261.2 KB · Views: 822
  • 76726643-33E7-4422-BA1A-555CC8D5F60B.jpeg
    76726643-33E7-4422-BA1A-555CC8D5F60B.jpeg
    168.9 KB · Views: 690
That's awesome. Not wasting any time at all. This project, the Well, CiBC square are moving at a very good clip. Wish The One can catch up, but it's off topic here.
 
Odd they wouldn't excavate the entire site all at once. Seems a waste to shore in the middle of the lot and then do the perimeter later.
 
on a project this scale a small wall of shoring is pennies, especially when it eliminates the risk and carrying cost of building a massive, oversized garage years before it is needed.
 
Pic today and one yesterday. The pace is good. They start around 7:30 and pack up around 3:30. There were 6 concrete trucks on site at one point today.
AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
 

Attachments

  • AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
    AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
    216.7 KB · Views: 646
  • AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
    AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
    209 KB · Views: 606
It's how you use it.

42
 

Back
Top