drum118
Superstar
July 02
Using address for this site as 28 Freeland St
Using address for this site as 28 Freeland St
Harbour Street is being realigned south of the build site. That existing section of Harbour will be turned into a public spaceWhy is there a gap between the building and the street?
I'm assuming you mean the gap between the excavation and Lake Shore. Phase 3, the 80-storey tower, goes in there.Why is there a gap between the building and the street?
I'm assuming you mean the gap between the excavation and Lake Shore. Phase 3, the 80-storey tower, goes in there.
42
View attachment 150265 View attachment 150266
Photo today and yesterday shows a structure in the excavation, and wood debris, perhaps from an old pier.
Click on the database file link near the top of the page, then on that page you'll find a number of links to front page stories. Read through them, starting at the bottom, (the oldest), first. They'll likely answer your question, and more.Might be an obvious question but what is happening to the Toronto Star building? A complete demo? If so where is the Toronto Star office moving to?
I don't think those piers would be long enough - those would be under the rail corridor today.