A person-in-crisis barricaded themselves in the cab of the high mast crane here, and had to be rescued by Toronto Fire!

 
58625D57-72E6-456E-9517-1C76D3386727.jpeg
 
Pictures from the past 6 days.
Saturday
77E76CA1-FF80-4387-8612-B7E2D6286E85.jpeg


4E315502-EFCD-496B-8270-6DCFF159DF68.jpeg


CD28A0E0-FDBE-48A8-8B6B-1D496BAB2145.jpeg


1EF9AB80-3D6A-46E0-88ED-78DD1F232932.jpeg



Tuesday
07F839F7-A12C-4DA5-8D5C-0A25CCC03143.jpeg



0D431325-ED32-456F-9D6F-901290005A1A.jpeg


F3D13AF8-C1E4-4CA3-87E9-D8A1D0F1DF10.jpeg


From today
59572C5E-9206-4CF0-939D-D3EB7F0D6786.jpeg

Third floor interior floor portion complete. The next pour will be the 3rd floor exterior deck.


From the Oct 2022 site plan approval drawings.