Midtown Urbanist
Superstar
Pulled from the launch teaser trailer:
LMAOAhh, another stunner from the "I love Architecture" guys at Camrost-Felcorp.
You know what, I think you're right!Hmm, that's hella quick if they were able to do shoring, excavation and crane installation within 2 and a half months or so. Time frame based on the last photo update from March.
I think that may possibly be for Groove Condos:
Groove Urban Condominiums | 46.29m | 15s | Block | RAW Design
Drove by along here on the weekend and saw that construction hoarding has been installed.urbantoronto.ca