Let's hope that there aren't any more "changes" from the original, proposed look... ..I got my delay notice...New Tentative move in date is September 30, 2011..(for lower floors)
Last edited:
Let's hope that there aren't any more "changes" from the original, proposed look... ..I got my delay notice...New Tentative move in date is September 30, 2011..(for lower floors)
good catch Uniqunik ... no wonder South Beach (as built) somehow looks a little different than I thought ... those 'fins' were suppose to extend along down on the entire facade, whereas its just glass now ~
condovo ... I reached that conclusion because the pouring of concrete has finished, and it is clear in the renderings that the 'fins' were suppose to extend from the roof all the way down the side of the building, projecting from the facades, which clearly is not happening ...
I have also gotten my notice with the new move in date as September 30th but I'm on the higher floors ( 21st) I'm hoping they don't have anymore delays.... Also with the fins i was talking to a worker and they still plan on putting up the fins but only after all the windows have been all placed.
I have also gotten my notice with the new move in date as September 30th but I'm on the higher floors ( 21st) I'm hoping they don't have anymore delays.... Also with the fins i was talking to a worker and they still plan on putting up the fins but only after all the windows have been all placed.
Interesting that the lower floors and higher floors, assuming, are getting the same information on move in dates...
Glad to hear that the fins are still part of the plan - looks a little dull without them.