denfromoakvillemilton
Senior Member
At this point, the Spadina extension will get finished because it's 70% complete and contracts have already been issued to get to 90%.
At this point it makes not an iota of difference who the MPP is.
^This.
It's entirely possible that at this point, finishing the project as planned is actually cheaper than buying out the existing contracts, letting the contractors walk, and leaving a mostly-finished subway to rot.
This is reality. It's a long term reality, instead of short term, which is the point.